Citat:
Jag har inte påstått att ”man inte undersökte en enda stålbit”. Här har du lite att gotta dig i ett tag och efter du tittat på följande klipp kanske du kan sluta ljuga och hitta på saker som att man inte undersökte en enda stålbit.
https://www.youtube.com/watch?v=gbA4BYnL4oc
Video bits were taken from TV documentary "World Trade Center: Anatomy of the Collapse" (TLC, 2002).
https://www.youtube.com/watch?v=6U5XqVHmmhI
VHS tape 1 of 2. Copied on DVD by NIST for FOIA release.
Recorded time frame: Nov. 21, 2001 to Jan. 25, 2002.
https://www.youtube.com/watch?v=bOQOBIhxNEE
VHS tape 2 of 2, copied on DVD by NIST for FOIA release.
Recorded time frame: Feb. 1, 2002 to March 19, 2002.
https://www.youtube.com/watch?v=wrk5VS_0Lhs
Tape 1 of released 3. Recorded in April 2002 (18:37 & 28:40). NIST campus in Gaithersburg, Maryland.
https://www.youtube.com/watch?v=G2j_tBYSet8
Tape 2 of released 3. Recorded in April 2002. NIST campus in Gaithersburg, Maryland.
https://www.youtube.com/watch?v=0lwfih-OdIQ
Tape 3 of released 3. Recorded in April 2002. NIST campus in Gaithersburg, Maryland.
Och slutligen lite stillbilder till dig så du i lugn och ro kan leka lite detektiv.
https://www.youtube.com/watch?v=DuuEBuLp38U
+ Tillhörande länk http://www.hugoneu.com/includes/pdfs/Speech-11-28-2001.pdf
"- the pathetic (underfunded, late to start) Building Performance Study team at Hugo Neu. In the first 10 days after 9/11, 35,000 tons of steel beams/columns were moved to Fresh Kills Landfill. Thereafter, the steel went to scrapyards. Hugo Neu received their first load Sept. 24 and by Nov. 4 they had completed their first contract with the city/Port Authority to recycle 25,000 tons. Metal Management worked a similar contract simultaneously. The next auction (October) sold 60,000 tons in 3 contracts."
https://www.youtube.com/watch?v=gbA4BYnL4oc
Video bits were taken from TV documentary "World Trade Center: Anatomy of the Collapse" (TLC, 2002).
https://www.youtube.com/watch?v=6U5XqVHmmhI
VHS tape 1 of 2. Copied on DVD by NIST for FOIA release.
Recorded time frame: Nov. 21, 2001 to Jan. 25, 2002.
https://www.youtube.com/watch?v=bOQOBIhxNEE
VHS tape 2 of 2, copied on DVD by NIST for FOIA release.
Recorded time frame: Feb. 1, 2002 to March 19, 2002.
https://www.youtube.com/watch?v=wrk5VS_0Lhs
Tape 1 of released 3. Recorded in April 2002 (18:37 & 28:40). NIST campus in Gaithersburg, Maryland.
https://www.youtube.com/watch?v=G2j_tBYSet8
Tape 2 of released 3. Recorded in April 2002. NIST campus in Gaithersburg, Maryland.
https://www.youtube.com/watch?v=0lwfih-OdIQ
Tape 3 of released 3. Recorded in April 2002. NIST campus in Gaithersburg, Maryland.
Och slutligen lite stillbilder till dig så du i lugn och ro kan leka lite detektiv.
https://www.youtube.com/watch?v=DuuEBuLp38U
+ Tillhörande länk http://www.hugoneu.com/includes/pdfs/Speech-11-28-2001.pdf
"- the pathetic (underfunded, late to start) Building Performance Study team at Hugo Neu. In the first 10 days after 9/11, 35,000 tons of steel beams/columns were moved to Fresh Kills Landfill. Thereafter, the steel went to scrapyards. Hugo Neu received their first load Sept. 24 and by Nov. 4 they had completed their first contract with the city/Port Authority to recycle 25,000 tons. Metal Management worked a similar contract simultaneously. The next auction (October) sold 60,000 tons in 3 contracts."
- Jag har påstått att de frivilliga ingenjörer som vittnade i senats-förhör hävdar att de inte hade ”authority” att undersöka/testa stål som fanns på uppsamlingsplatserna.
- Jag har citerat branschtidningen, Fire Engineering, som i princip hävdar samma sak.
- Jag har hävdar att NIST undersökte endast ca 270 ”bitar” av stålet men då inte med avseende på om det hade utsatts för explosiver eller incendiaries.
Så, förklara nu varför jag ”ljuger” här ovan.